Industrial Construction
Silver Eagle Addition
In early 2011, Kopplow began a renovation and expansion at the Del Rio facility. The project included the renovation of existing offices as well as the expansion of the warehouse with a new metal structure. Additionally, a Truck Wash was built on-site.
Kopplow, ending in 2013, completed the complete renovation of 7,500 square feet of executive office space to include the CEO’s office, conference rooms, hospitality area, and a museum like corridor area where a special collection was displayed. The project included special millwork, flooring and other finish details with high end materials.
The Silver Eagle Cooler Addition in San Antonio includes the expansion of the existing the Controlled Environment Warehouse (CEW), addition of a new Draught Cooler, a Truck Wash as well as additional administrative offices. This total expansion, which was done with insulated tilt wall panels, totaled over 131,000 square feet. This project was completed in 2015.
Project Highlights
- 131,000 square foot total construction
- Project Completed: 2015
Ready to break ground on your next project? Contact us to get started.